In the heart of the Ruhr area, a new state-of-the-art logistics and commercial property is being developed on a site of approx. 18,500 m². Scheduled for completion in Q1 2026, the building offers exclusive use of around 7,770 m² GFA of warehouse space, approx. 390 m² GFA of office space, and 380 m² GFA of mezzanine space. The property follows a comprehensive sustainable concept and aims to achieve “Gold” certification from the German Sustainable Building Council (DGNB).
Grundstücksfläche
18.500 m²
Hallenfläche (BGF)
ca. 7.770 m²
Mezzanine (BGF)
ca. 380 m²
Büro-/Sozialfläche (BGF)
ca. 390 m²
Location | Klöckner Straße 55 44579 Castrop-Rauxel |
Project type | Brownfield development |
Stellplätze | 90 car parking spaces |
Loading | 1 Level access door (4,00 m x 4,50 m) 9 Dock level loading doors with electric drive |
Certification | DNGB Gold targeted |
Availability | Under construction, completion Q2/2026 |
Fossil-free heating via heat pump |
Planned photovoltaic system |
Sprinkler system in accordance with FM Global standards |
Clear height: approx. 9.50 m |
Floor load capacity: 50 kN/m² |
LED lighting |
Green roof |
Outdoor areas with well-being zones |
EV charging station and pre-installations for cars |