Alte Ziegelei 3, 84405 Dorfen

New development - OAK Logistics park

Project description

The OAK Logistics Park is being developed on a brownfield site of approximately 33,000 m² in the town of Dorfen, near Munich.

The logistics property offers a total area of around 19,300 m² - comprising around 17,450 m² of warehouse space, 900 m² of mezzanine space, and 950 m² of office/social space. The property comprises two flexibly divisible units, with around 12,000 m² of total rental space in Unit 1 and around 7,350 m² of total rental space in Unit 2. Divided into two fire compartments, the hall areas are suitable for production, warehousing, and logistics.

The OAK Logistics Park will meet the highest requirements for energy efficiency and sustainability and comply with the criteria of the EU Taxonomy. Certification by the German Sustainable Building Council (DGNB) according to its highest building standard, “Platinum,” is being targeted.

Prime Location East of Munich

Dorfen is located in close proximity to the A94 motorway and is considered one of the top logistics hubs in the Munich region. The site combines excellent logistical accessibility with a high quality of life in the surrounding area. Of particular note is the proximity to Munich Airport and the Munich-Riem transshipment terminal, a modern freight hub with direct rail connection.The railway line between Dorfen and Munich is integrated into the Munich Transport and Tariff Association (MVV), allowing public transport passengers to reach Munich East in around 35 minutes.

  • 1 km to A94 motorway
  • 40 km to A92 motorway
  • 50 km to A9 motorway
  • 53 km to A8 motorway
  • 40 km to Munich-Riem freight terminal
  • 33 km to Munich Airport

Site area

approx.32,950​ m²

Warehouse space

approx. 17,453 m²

Mezzanine

approx. 901 m²

Office / Social space

approx. 948 m²

Keyfacts

Location Alte Ziegelei 3
84405 Dorfen
Project type Brownfield-Development
Car parking spaces 55
Bike parking spaces 40
Level access doors 2
Loading docks 15
Certification DGNB Platin targeted
Availability Completion in July 2026 planned

Specifications

Fossil-free heating via heat pump
Planned photovoltaic system
ESFR sprinkler system in accordance with FM Global
Clear height 12 m (to underside of beam)
Floor load capacity 7 t/m²
Storage of water-hazardous materials possible (WGK foil)
Smart LED lighting
E-charging stations for cars and bicycles
Outdoor areas with well-being zones (incl. table tennis, barbecue area, boules court)

Floorplan

We look forward to your inquiry