Alte Ziegelei, 84405 Dorfen

New development - OAK Logistics park

Project description

The OAK Logistics Park is being developed on a brownfield site of approx. 33,000 m² in the town of Dorfen, near Munich. The site was formerly used as a brickworks. The property will offer a total area of around 19,190 m², including 17,341 m² of warehouse space, 901 m² of mezzanine space, and 948 m² of office and social space.

The warehouse area is divided into two fire sections and can be flexibly partitioned, with units available from approx. 6,500 m². The OAK Logistics Park is designed to meet the highest standards of energy efficiency and sustainability, fully compliant with EU Taxonomy criteria. In addition, the project aims to achieve certification from the German Sustainable Building Council (DGNB) at the highest level, Platinum.

Prime Location East of Munich

Dorfen is located in close proximity to the A94 motorway and is considered one of the top logistics hubs in the Munich region. The site combines excellent logistical accessibility with a high quality of life in the surrounding area. Of particular note is the proximity to Munich Airport and the Munich-Riem transshipment terminal, a modern freight hub with direct rail connection.The railway line between Dorfen and Munich is integrated into the Munich Transport and Tariff Association (MVV), allowing public transport passengers to reach Munich East in just 32 minutes.

  • 1 km to A94 motorway
  • 40 km to A92 motorway
  • 50 km to A9 motorway
  • 53 km to A8 motorway
  • 40 km to Munich-Riem freight terminal
  • 33 km to Munich Airport

Site area

approx. 32,950​ m²

Hall space (GFA)

approx. 17,341 m²

Mezzanine (GFA)

approx. 874 m²

Office / Social space (GFA)

approx. 1,055 m²

Keyfacts

Location Alte Ziegelei
84405 Dorfen
Project type Brownfield-Development
Parking spaces 85
Level access doors 2
Dock loading doors 15
Operating permit 24/7
Certification DNGB Platin targeted
Availability Under construction, completion Q3/2026

Specifications

Fossil-free heating via heat pump
Planned photovoltaic system
ESFR sprinkler system
Clear height 12.20 m (to underside of beam)
Floor load capacity 7 t/m²
Storage of water-hazardous materials possible (WGK liner)
Smart LED lighting
E-charging stations for cars and bicycles
Outdoor areas with well-being zones (incl. table tennis, barbecue area, boules court)

Floorplan

We look forward to your inquiry