In Eschweiler, North Rhine-Westphalia, new production and warehouse facilities have been developed on a site measuring approximately 41,400 m² and tailored to the tenant’s specific requirements. Designed for sole occupancy, the new building provides approximately 19,510 m² of warehouse space, 1,750 m² of office space, and 1,570 m² of mezzanine space for storage and production.
The property follows a comprehensive sustainability concept and is targeting certification by the German Sustainable Building Council (DGNB) under its highest building standard, “Platinum”.
Site area
approx.41,400 m²
Warehouse space
approx. 19,510 m²
Mezzanine
approx. 1,570 m²
Office / Social area
approx. 1,750 m²
| Location | Graf-Zeppelin-Straße 3 52249 Eschweiler |
| Project type | Greenfield development |
| Loading | 10 Loading docks |
| 3 Level access doors | |
| Parking | 73 car parking spaces |
| Certification | DGNB Platin targeted |
| Availability | Leased |
| Fossil-free heating via heat pump |
| Planned photovoltaic system |
| ESFR sprinkler system in accordance with FM Global |
| Clear height: approx. 10.0 m |
| Floor load capacity: 50 kN/m² |
| LED lighting, smart-metering |
| Rainwater utilization |
| Outdoor areas with well-being zones |
| EV charging stations for cars |